Minimum Data Requirements

Minimum Data Requirements

Guidance on essential data that should be collected to track progress of each phase of an ITN distribution campaign against targets and ensure accountability for the ITNs distributed.

Process Evaluation

Process Evaluation

Guidance in the systematic assessment of the design, implementation and results of an ITN mass distribution campaign, with downloadable tools that can be adapted to the requirements of a specific national malaria programme and country.

ITN Tracking Systems

ITN Tracking Systems

Background information on Sudan LLINs tracking system.