Data Definitions

VariableVariable descriptionData typeVisibilityCategories (if any)Category description
CountryName of country with mass campaigns for ITN distributionTextPublic  
WHO regionRegions identified by the WHODrop-down (one option)PublicAfrican region 
Americas region 
South-East Asia region 
European region 
Eastern mediterranean region 
Western Pacific region 
Initial campaign yearCalendar year campaign initially would take place, stated in year
As stated in Global Fund grant, PMI MOP or other plans.
Drop-down (one option)PublicPending submission of data 
2024 
2025 
2026 
2027 
Current campaign yearCalendar year campaign will take place according to latest updates, stated in yearDrop-down (one option)PublicPending submission of data 
2024 
2025 
2026 
2027 
Geographic targetGeographic target refers to the specific geographic areas or regions targeted for the campaign as well as how the distribution method will be executed.
“National” indicates targeting at the level of the entire country, while “Sub-national” indicates targeting at a more localized level, such as specific regions, districts, or communities within the country.
The ITN campaign rollout strategy outlines how the distribution methods for ITN will be executed.
“Single-phase” distribution indicates that all ITNs are distributed at once, while “multi-phase” involves multiple stages of distribution over time (e.g. pilot distribution first and then remaining targeted areas). A “rolling distribution” is used for countries that continuously have campaigns every year to cover the country.
Drop-down (one option)PublicNational – one phase 
National – multi-phases 
National – rolling distribution 
Sub-national – one phase 
Sub-national – multi phases 
Sub-national – rolling distribution 
Unknown 
Geographic scope (Provinces, States, Regions)Disaggregated data or information by states, province, or region where availableTextPublic  
Geographic scope (district, county, LGA)Disaggregated data or information by district (or equivalent) level where availableTextPublic  
Population targetedNumber of people targeted for the mass ITN campaign disaggregated to sub-national levels if availableNumberPublic  
# of ITNs plannedITNs planned for the campaign based on national malaria programme information, RBM gap analysis or other sources.NumberPublic  
ITN typeType of ITN plannedDrop-down (multiple choice)PublicDual AI 
PBO 
Standard ITN 
Unknown 
Net brand
(hidden)
Brand of the ITN (not publicly disclosed on the AMP website)Drop-down (multiple choice)Not publicDuraNet LNCompany: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Alpha-cypermethrin
DuraNet PlusCompany: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
GreenNetCompany: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Deltamethrin
InterceptorCompany: BASF AGRO B.V. Arnhem (NL) Freienbach Branch | Active Ingredient/Synergist: Alpha-cypermethrin
Interceptor G2Company: BASF AGRO B.V. Arnhem (NL) Freienbach Branch | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
MAGNetCompany: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Alpha-cypermethrin
MiraNetCompany: AtoZ Group Limited | Active Ingredient/Synergist: Alpha-cypermethrin
OLYSET NetCompany: Sumitomo Chemical Co., Ltd | Active Ingredient/Synergist: Permethrin
OLYSET PLUSCompany: Sumitomo Chemical Co., Ltd | Active Ingredient/Synergist: Permethrin, Piperonyl Butoxide (PBO)
Panda Net 2.0Company: Life Ideas Biotechnology Co. Ltd | Active Ingredient/Synergist: Deltamethrin
PermaNet 2.0Company: Vestergaard Sarl | Active Ingredient/Synergist: Deltamethrin
PermaNet 3.0Company: Vestergaard Sarl | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
PermaNet DualCompany: Vestergaard Sarl | Active Ingredient/Synergist: Chlorfenapyr, Deltamethrin
PRONet DuoCompany: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Bifenthrin, Chlorfenapyr
Reliefnet ReverteCompany: Real Relief Health ApS | Active Ingredient/Synergist: Deltamethrin
Royal GuardCompany: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin, Pyriproxyfen
Royal Sentry 2.0Company: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin
SafeNetCompany: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin
SAFENET PLUSCompany: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
Tsara BoostCompany: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Tsara PlusCompany: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Tsara SoftCompany: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin
UNET G1 LNCompany: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Deltamethrin
UNET G3 LNCompany: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
UNET G5 LNCompany: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
VEERALINCompany: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
Yahe LNCompany: Fujian Yamei Industry & Trade Co. Ltd | Active Ingredient/Synergist: Deltamethrin
Yorkool G1 LNCompany: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Deltamethrin
Yorkool G3 LNCompany: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Yorkool G5 LNCompany: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
Unknown 
Funding partner (procurement)Partner(s) responsible for financing the procurement of ITNsDrop-down (one option)PublicAMFAgainst malaria foundation
Global Fund 
Government 
Multiple 
US state department (formerly PMI)previously known as PMI
Islamic Development Bank (IDP) 
Givewell 
Other 
Unknown 
Funding partner (implementation)Partner(s) responsible for financing the implementation of the distribution of ITNsDrop-down (multiple choice)PublicAMFAgainst malaria foundation
Global Fund 
Government 
US state department (formerly PMI)previously known as PMI
UNDP 
SANRU 
International Dispensary Association (IDA) Foundation 
Population Services International (PSI) 
World Bank 
Islamic Development Bank (IDP) 
Givewell 
Other 
Unknown 
Funding & ITN procurementStatus of the funding and procurement process for ITNs, including whether a funding application is in progress, approved, or ITNs have been procured.Drop-down (one option)Not publicPreparing application 
Funding requested 
Funding approved 
ITNs procured 
Other 
Unknown 
ITN Delivery status to countryStatus of the ITN distribution process, i.e. whether ITNs have been ordered, received, or are still awaiting delivery to country.Drop-down (one option)Not publicPending ITN arrival 
Delivered in-country 
Other 
Unknown 
ITN projected arrival date in-countryPlanned date of ITN arrival in-country.Date (month year)Not public  
Distribution strategyStrategy adopted for ITN distributionDrop-down (one option)PublicDoor to doorDistribution teams go from house to house to directly distribute ITNs to residents.
Fixed distribution sitesDesignated sites such as health centers, schools, or other community locations are set up where beneficiaries can go to receive their ITNs.
Hybrid approachA combination of distribution strategies. For example, a distribution campaign might start with door-to-door distribution in scattered rural areas, followed by fixed distribution sites in urban or densely populated areas.
Unknown 
Initial date planned for distribution (Month Year)Planned date for start of campaign activity in month/year as stated in GF grant, PMI MOP or other.Date (month YEAR)Not public  
Current date planned for distribution (Month Year)Latest updated planned date for start of campaign activity in month/year.Date (month YEAR)Public  
Delay of net distribution (# months)Represents the difference in months between the Initial planned date and the Current planned date for net distribution.AutomatedPublic  
Current campaign phaseThe current campaign phase refers to the planning and/or implementation situation, based on the most recent information.Country view: Displays the phase reported for subnational levels where available (eg district or region).
Global view: Derived from subnational data where available and reflects overall campaign progress, only displaying “Complete” when the entire campaign has been finalised.
Drop-down (one option)PublicPlanned/Not startedCampaign planning has not yet started
Planificación macroDefining the strategy for all campaign technical areas and developing key documents, timeline and budget (operations, M&E, logistics, social and behaviour change, etc.)
MicroplanificaciónUpdating the macroplans for each district targeted for the campaign with information from decentralized levels to reflect actual context for implementation
ImplementationOngoing trainings, household registration, ITN distribution or other campaign processes
On holdCampaign planning and/or implementation is temporarily paused or cannot proceed as currently planned.
CompleteAll campaign processes and ITN distribution have been successfully completed
ReprogrammedThe campaign will not be implemented as originally planned. Activities or commodities have been reprogrammed to alternative delivery channels, geographic areas, or target populations within the same funding period.
UnknownData is currently unavailable
Campaign statusCampaign status is a measure of the progress of the campaign activities according to the initial or revised timeline.Status is primarily reported by the National Malaria Programme (NMP) and/or in-country partners based on planned timelines, current phase of implementation, reported delays, and identified bottlenecks.
Country view: Displays the phase reported for subnational levels where available (eg district or region).
Global view: Derived from subnational data where available and reflects overall campaign status based on most recent update.
Drop-down (one option) + colour codedPublicOn trackThe campaign is on track to take place in the same calendar year initially planned/there are no significant bottlenecks identified as of the last report date that would move the campaign off track compared to the revised timeline.
At riskSome risk that the campaign will run into delays/not take place in calendar year planned; a situation not yet critical but important to watch and ensure that the bottlenecks do not grow and move the country off-track to the initial or revised timeline
Off trackSignificant concerns and campaign at risk of significant delay/not taking place in the calendar year planned; intervention required to address bottlenecks and move country planning back to on track
CompleteAll campaign processes and ITN distribution have been successfully completed
Planned/Not startedCampaign is planned but data has not yet been finalised or are estimations.
CancelledThe campaign will not be implemented as originally planned within the current campaign year or funding cycle. Activities, commodities, targets, or delivery channels may be reprogrammed, reassigned, or delivered through alternative mechanisms, and the original campaign plan will not reach completion.
UnknownData is currently unavailable
Status reasonsAdditional information or elaboration regarding the current status of the campaign.Drop-down (multiple choice)PublicDelayed ITN deliveryCases where ITNs are delayed in production, shipping, or customs clearance, preventing timely arrival of ITNs into the country.
Includes situations of incomplete deliveries, incorrect quantities, or damaged stock.
Excludes in-country storage and dispatch (captured under Planned activities).
Funding request/disbursement delaySituations where financial resources are not yet available to the campaign implementers because of pending or delayed processing of fund requests or disbursements.
Includes internal review/approval processes, administrative bottlenecks, or delayed transfer of funds.
Funding / ITN / coordination gapCases where campaign timelines are affected by pending alignment across partners (e.g., government, implementing partner, donor, procurement agent).
Includes delays in sign-offs, approvals, or agreement on operational modalities.
Planned activities behind scheduleWhen campaign preparatory activities (e.g., procurement, training, microplanning, supervision, logistics arrangements) are not yet completed or are behind schedule.
Includes pending availability of training materials, delayed microplanning validation, or incomplete staff deployment.
Digitalization delaySituations where readiness of digital tools/platforms (DHIS2, dashboards, electronic data collection tools) is causing postponement of activities.
Includes delays in configuration, testing, user training, or equipment deployment.
Major national activity (census, elections, …)Situations where a major national activity restrict the implementation of ITN campaigns (census, elections, political campaigns, …)
Public health campaignConflicting and uncoordinated other health campaign delays the ITN mass campaign distribution.
Operational context / changesSituations where recent or ongoing events disrupt safe access or program operations. This can include severe weather, natural disasters, infrastructure damage, conflict, violence, or public health emergencies. It covers destruction of roads, inaccessibility of areas, or unsafe conditions that impede campaign planning or implementation.
Other 
Not applicableFor cases where the campaign status is “green / on track.”
Key issues on campaign status
(hidden)
Additional information or elaboration regarding the current status of the campaign, not visible to users on the AMP website.textNot public  
Comment on campaign status
(visible on website)
Provide additional information or details regarding the status, specifically to be placed on the website. Only needed when status is at risk, off track or delayed.
If the campaign dates have been revised, they will be noted here.
textPublic  
Month distribution took placeSpecific month during which the distribution of the ITNs is completed.Date (month YEAR)Public  
# of ITNs distributed (hidden)Total count of ITNs that have been distributed (not publicly disclosed on the AMP website)numberNot public  
Campaign digitalizationIndicates the extent to which campaign processes and components are digitizedDrop-down (one option)PublicNone (paper-only) 
Targeted components 
Hybrid (paper+digital) 
Fully digitalized 
Unknown 
Scale of digital data collectionScale of the deployment of the digital data collectionTextPublicNational level 
Sub-national level 
Pilot 
No digitalization 
Unknown 
Platform usedDigital platform in useDrop-down (one option)PublicIASO – Bluesquare 
Commcare (Dimagi) 
DIGIT-HCM (eGov) 
DHIS2 
Kobo/ODK 
Redrose 
Revelar 
eCHIS 
Bespoke/custom 
Other (specify in comments) 
No digitalization 
Unknown 
IntegrationIntegration refers to the coordination between different components within the National Malaria Control Program both internally and externally. Internally, integration involves the alignment between interventions such as Seasonal Malaria Chemoprevention (SMC), Indoor Residual Spraying (IRS), and Malaria Vaccine programs. Externally, integration refers to the NMCP’s coordination with other health programs like the Expanded Program on Immunization (EPI), Neglected Tropical Diseases (NTDs), and Vitamin A supplementation initiatives.Drop-down (one option)PublicInternal NMP – SMC, IRS, Malaria vaccine, Other 
External NMP- EPI, NTDs, Vit A, Other 
No integration 
Unknown 
AMP providing technical assistanceIndicates whether the AMP (Alliance for Malaria Prevention) is providing technical assistance (TA) to support the national malaria programme during the specified campaign year.Drop-down (one option)Public  
Last updated (date)Date the main data source was last updatedDate (DD-MM)Public  
CommentProvide additional information or details regarding the status. Any status reasons no longer applicable will be noted here for tracking reasons.textNot public  
Ir al inicio de la página