Variable Variable description Data type Visibility Categories (if any) Category description
Country Name of country with mass campaigns for ITN distribution Text Public
WHO region Regions identified by the WHO Drop-down (one option) Public African region
Americas region
South-East Asia region
European region
Eastern mediterranean region
Western Pacific region
Initial campaign year Calendar year campaign initially would take place, stated in year
As stated in Global Fund grant, PMI MOP or other plans.
Drop-down (one option) Public Pending submission of data
2024
2025
2026
2027
Current campaign year Calendar year campaign will take place according to latest updates, stated in year Drop-down (one option) Public Pending submission of data
2024
2025
2026
2027
Geographic target Geographic target refers to the specific geographic areas or regions targeted for the campaign as well as how the distribution method will be executed.
“National” indicates targeting at the level of the entire country, while “Sub-national” indicates targeting at a more localized level, such as specific regions, districts, or communities within the country.
The ITN campaign rollout strategy outlines how the distribution methods for ITN will be executed.
“Single-phase” distribution indicates that all ITNs are distributed at once, while “multi-phase” involves multiple stages of distribution over time (e.g. pilot distribution first and then remaining targeted areas). A “rolling distribution” is used for countries that continuously have campaigns every year to cover the country.
Drop-down (one option) Public National – one phase
National – multi-phases
National – rolling distribution
Sub-national – one phase
Sub-national – multi phases
Sub-national – rolling distribution
Unknown
Geographic scope (Provinces, States, Regions) Disaggregated data or information by states, province, or region where available Text Public
Geographic scope (district, county, LGA) Disaggregated data or information by district (or equivalent) level where available Text Public
Population targeted Number of people targeted for the mass ITN campaign disaggregated to sub-national levels if available Number Public
# of ITNs planned ITNs planned for the campaign based on national malaria programme information, RBM gap analysis or other sources. Number Public
ITN type Type of ITN planned Drop-down (multiple choice) Public Dual AI
PBO
Standard ITN
Unknown
Net brand
(hidden)
Brand of the ITN (not publicly disclosed on the AMP website) Drop-down (multiple choice) Not public DuraNet LN Company: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Alpha-cypermethrin
DuraNet Plus Company: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
GreenNet Company: Shobikaa Impex Private Limited | Active Ingredient/Synergist: Deltamethrin
Interceptor Company: BASF AGRO B.V. Arnhem (NL) Freienbach Branch | Active Ingredient/Synergist: Alpha-cypermethrin
Interceptor G2 Company: BASF AGRO B.V. Arnhem (NL) Freienbach Branch | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
MAGNet Company: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Alpha-cypermethrin
MiraNet Company: AtoZ Group Limited | Active Ingredient/Synergist: Alpha-cypermethrin
OLYSET Net Company: Sumitomo Chemical Co., Ltd | Active Ingredient/Synergist: Permethrin
OLYSET PLUS Company: Sumitomo Chemical Co., Ltd | Active Ingredient/Synergist: Permethrin, Piperonyl Butoxide (PBO)
Panda Net 2.0 Company: Life Ideas Biotechnology Co. Ltd | Active Ingredient/Synergist: Deltamethrin
PermaNet 2.0 Company: Vestergaard Sarl | Active Ingredient/Synergist: Deltamethrin
PermaNet 3.0 Company: Vestergaard Sarl | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
PermaNet Dual Company: Vestergaard Sarl | Active Ingredient/Synergist: Chlorfenapyr, Deltamethrin
PRONet Duo Company: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Bifenthrin, Chlorfenapyr
Reliefnet Reverte Company: Real Relief Health ApS | Active Ingredient/Synergist: Deltamethrin
Royal Guard Company: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin, Pyriproxyfen
Royal Sentry 2.0 Company: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin
SafeNet Company: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin
SAFENET PLUS Company: Mainpol GmbH | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
Tsara Boost Company: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Tsara Plus Company: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Tsara Soft Company: PPP Hollandi DMCC | Active Ingredient/Synergist: Deltamethrin
UNET G1 LN Company: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Deltamethrin
UNET G3 LN Company: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
UNET G5 LN Company: Sino Africa Medical Devices Company Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
VEERALIN Company: V.K.A. Polymers Pvt. Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Piperonyl Butoxide (PBO)
Yahe LN Company: Fujian Yamei Industry & Trade Co. Ltd | Active Ingredient/Synergist: Deltamethrin
Yorkool G1 LN Company: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Deltamethrin
Yorkool G3 LN Company: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Deltamethrin, Piperonyl Butoxide (PBO)
Yorkool G5 LN Company: Tianjin Yorkool International Trading Co., Ltd | Active Ingredient/Synergist: Alpha-cypermethrin, Chlorfenapyr
Unknown
Funding partner (procurement) Partner(s) responsible for financing the procurement of ITNs Drop-down (one option) Public AMF Against malaria foundation
Global Fund
Government
Multiple
US state department (formerly PMI) previously known as PMI
Islamic Development Bank (IDP)
Givewell
Other
Unknown
Funding partner (implementation) Partner(s) responsible for financing the implementation of the distribution of ITNs Drop-down (multiple choice) Public AMF Against malaria foundation
Global Fund
Government
US state department (formerly PMI) previously known as PMI
UNDP
SANRU
International Dispensary Association (IDA) Foundation
Population Services International (PSI)
World Bank
Islamic Development Bank (IDP)
Givewell
Other
Unknown
Funding & ITN procurement Status of the funding and procurement process for ITNs, including whether a funding application is in progress, approved, or ITNs have been procured. Drop-down (one option) Not public Preparing application
Funding requested
Funding approved
ITNs procured
Other
Unknown
ITN Delivery status to country Status of the ITN distribution process, i.e. whether ITNs have been ordered, received, or are still awaiting delivery to country. Drop-down (one option) Not public Pending ITN arrival
Delivered in-country
Other
Unknown
ITN projected arrival date in-country Planned date of ITN arrival in-country. Date (month year) Not public
Distribution strategy Strategy adopted for ITN distribution Drop-down (one option) Public Door to door Distribution teams go from house to house to directly distribute ITNs to residents.
Fixed distribution sites Designated sites such as health centers, schools, or other community locations are set up where beneficiaries can go to receive their ITNs.
Hybrid approach A combination of distribution strategies. For example, a distribution campaign might start with door-to-door distribution in scattered rural areas, followed by fixed distribution sites in urban or densely populated areas.
Unknown
Initial date planned for distribution (Month Year) Planned date for start of campaign activity in month/year as stated in GF grant, PMI MOP or other. Date (month YEAR) Not public
Current date planned for distribution (Month Year) Latest updated planned date for start of campaign activity in month/year. Date (month YEAR) Public
Delay of net distribution (# months) Represents the difference in months between the Initial planned date and the Current planned date for net distribution. Automated Public
Current campaign phase The current campaign phase refers to the planning and/or implementation situation, based on the most recent information.

Country view: Displays the phase reported for subnational levels where available (eg district or region).
Global view: Derived from subnational data where available and reflects overall campaign progress, only displaying “Complete” when the entire campaign has been finalised.

Drop-down (one option) Public Planned/Not started Campaign planning has not yet started
Macroplanning Defining the strategy for all campaign technical areas and developing key documents, timeline and budget (operations, M&E, logistics, social and behaviour change, etc.)
Microplanning Updating the macroplans for each district targeted for the campaign with information from decentralized levels to reflect actual context for implementation
Implementation Ongoing trainings, household registration, ITN distribution or other campaign processes
On hold Campaign planning and/or implementation is temporarily paused or cannot proceed as currently planned.
Complete All campaign processes and ITN distribution have been successfully completed
Reprogrammed The campaign will not be implemented as originally planned. Activities or commodities have been reprogrammed to alternative delivery channels, geographic areas, or target populations within the same funding period.
Unknown Data is currently unavailable
Campaign status Campaign status is a measure of the progress of the campaign activities according to the initial or revised timeline.

Status is primarily reported by the National Malaria Programme (NMP) and/or in-country partners based on planned timelines, current phase of implementation, reported delays, and identified bottlenecks.
Country view: Displays the phase reported for subnational levels where available (eg district or region).
Global view: Derived from subnational data where available and reflects overall campaign status based on most recent update.

Drop-down (one option) + colour coded Public On track The campaign is on track to take place in the same calendar year initially planned/there are no significant bottlenecks identified as of the last report date that would move the campaign off track compared to the revised timeline.
At risk Some risk that the campaign will run into delays/not take place in calendar year planned; a situation not yet critical but important to watch and ensure that the bottlenecks do not grow and move the country off-track to the initial or revised timeline
Off track Significant concerns and campaign at risk of significant delay/not taking place in the calendar year planned; intervention required to address bottlenecks and move country planning back to on track
Complete All campaign processes and ITN distribution have been successfully completed
Planned/Not started Campaign is planned but data has not yet been finalised or are estimations.
Cancelled The campaign will not be implemented as originally planned within the current campaign year or funding cycle. Activities, commodities, targets, or delivery channels may be reprogrammed, reassigned, or delivered through alternative mechanisms, and the original campaign plan will not reach completion.
Unknown Data is currently unavailable
Status reasons Additional information or elaboration regarding the current status of the campaign. Drop-down (multiple choice) Public Delayed ITN delivery Cases where ITNs are delayed in production, shipping, or customs clearance, preventing timely arrival of ITNs into the country.
Includes situations of incomplete deliveries, incorrect quantities, or damaged stock.
Excludes in-country storage and dispatch (captured under Planned activities).
Funding request/disbursement delay Situations where financial resources are not yet available to the campaign implementers because of pending or delayed processing of fund requests or disbursements.
Includes internal review/approval processes, administrative bottlenecks, or delayed transfer of funds.
Funding / ITN / coordination gap Cases where campaign timelines are affected by pending alignment across partners (e.g., government, implementing partner, donor, procurement agent).
Includes delays in sign-offs, approvals, or agreement on operational modalities.
Planned activities behind schedule When campaign preparatory activities (e.g., procurement, training, microplanning, supervision, logistics arrangements) are not yet completed or are behind schedule.
Includes pending availability of training materials, delayed microplanning validation, or incomplete staff deployment.
Digitalization delay Situations where readiness of digital tools/platforms (DHIS2, dashboards, electronic data collection tools) is causing postponement of activities.
Includes delays in configuration, testing, user training, or equipment deployment.
Major national activity (census, elections, …) Situations where a major national activity restrict the implementation of ITN campaigns (census, elections, political campaigns, …)
Public health campaign Conflicting and uncoordinated other health campaign delays the ITN mass campaign distribution.
Operational context / changes Situations where recent or ongoing events disrupt safe access or program operations. This can include severe weather, natural disasters, infrastructure damage, conflict, violence, or public health emergencies. It covers destruction of roads, inaccessibility of areas, or unsafe conditions that impede campaign planning or implementation.
Other
Not applicable For cases where the campaign status is “green / on track.”
Key issues on campaign status
(hidden)
Additional information or elaboration regarding the current status of the campaign, not visible to users on the AMP website. text Not public
Comment on campaign status
(visible on website)
Provide additional information or details regarding the status, specifically to be placed on the website. Only needed when status is at risk, off track or delayed.
If the campaign dates have been revised, they will be noted here.
text Public
Month distribution took place Specific month during which the distribution of the ITNs is completed. Date (month YEAR) Public
# of ITNs distributed (hidden) Total count of ITNs that have been distributed (not publicly disclosed on the AMP website) number Not public
Campaign digitalization Indicates the extent to which campaign processes and components are digitized Drop-down (one option) Public None (paper-only)
Targeted components
Hybrid (paper+digital)
Fully digitalized
Unknown
Scale of digital data collection Scale of the deployment of the digital data collection Text Public National level
Sub-national level
Pilot
No digitalization
Unknown
Platform used Digital platform in use Drop-down (one option) Public IASO – Bluesquare
Commcare (Dimagi)
DIGIT-HCM (eGov)
DHIS2
Kobo/ODK
Redrose
Reveal
eCHIS
Bespoke/custom
Other (specify in comments)
No digitalization
Unknown
Integration Integration refers to the coordination between different components within the National Malaria Control Program both internally and externally. Internally, integration involves the alignment between interventions such as Seasonal Malaria Chemoprevention (SMC), Indoor Residual Spraying (IRS), and Malaria Vaccine programs. Externally, integration refers to the NMCP’s coordination with other health programs like the Expanded Program on Immunization (EPI), Neglected Tropical Diseases (NTDs), and Vitamin A supplementation initiatives. Drop-down (one option) Public Internal NMP – SMC, IRS, Malaria vaccine, Other
External NMP- EPI, NTDs, Vit A, Other
No integration
Unknown
AMP providing technical assistance Indicates whether the AMP (Alliance for Malaria Prevention) is providing technical assistance (TA) to support the national malaria programme during the specified campaign year. Drop-down (one option) Public
Last updated (date) Date the main data source was last updated Date (DD-MM) Public
Comment Provide additional information or details regarding the status. Any status reasons no longer applicable will be noted here for tracking reasons. text Not public